Subsystem stack fit check

On 12 October 2018 the MIST subsystems were stacked up for the first time to see that they fit inside the central 1U unit of MIST. The check went well and the subsystem stack will be electrically tested in this integrated fashion for a period. Then the subsystems will again be mounted on the Flatsat board.

Subsystem_stack_A

The completed subsystem stack. The radio is on top. We have left coax cables attached to avoid wearing out the very small coaxial connectors on the radio.

Fitc_check

David and Agnes checking distances. Note the ESD (ElectroStatic Discharge) discipline!

Fit_check_B

These are the clearances that we wanted to check.

Fit_check_C

We need to reduce this length by shortening the spacers on the left,
which should not be a problem.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Blog at WordPress.com.

Up ↑

%d bloggers like this: