On 28 January/ 2026 the experiments in the MIST “bottom stack” underwent qualification vibration tests at RI.SE i Kista. The objective was to subject the units to qualification vibration levels compatible with SpaceX’s Falcon 9 launch vehicles. All units survived the test and no screws or connectors shook loose!

The black box on the vibrator table is the adapter containing the satellite. Accelerometers can be seen attached to the vibration adapter.

Above the satellite is placed in its transportation container.
Leave a comment