On 16 December 2020 the MIST integration lab was re-organized and laid out around a central area with the “Flatsat” (circuit board stack in the middle of the table nearest to the camera) and hardware simulators on one side of a large table and computers for control and programming on the other side. A new ESD mat is clearly needed to cover the entire table.

Leave a Reply