On Thursday 3 September 2020 the MIST project took delivery of the flight harness for MIST. The box may look insignificant but the assembly of this critical subsystem needs to be done with expertise. The MIST project is therefore very grateful to W5 Solutions and their Solna facility for doing this work as a contribution to the project. At the delivery KTH Space Center director and astronaut Christer Fuglesang (left), students Filippo Pozzi and Topias Tyystjärvi as well as W5 Solutions product manager Åke Söderlund attended.
MIST cable harness delivered – thanks W5 Solutions!

Leave a Reply