The 3U structure from our subsystem supplier, ISIS, arrived on March 21, 2016. One little step forward.
Structure for the 3D-printed fit check model of MIST has arrived

The MIniature Student saTellite
A professionally run student project at KTH
The 3U structure from our subsystem supplier, ISIS, arrived on March 21, 2016. One little step forward.
Leave a Reply